Home / Guides
Guides
Practical guides for stone fabricators.
Straightforward, shop-floor guidance on estimating, templating, production handoff and remakes. No fluff, and you can use it with or without StoneCraftOS.
8 min read
Countertop Estimating: From Field Measurements to a Quote
How stone fabricators turn measurements into a quote: square footage, waste, edges, cutouts, backsplash, installation and margin.
Read the guide →
7 min read
Countertop Templating Checklist: What to Confirm Before You Cut
A field checklist for templating countertops: site conditions, cabinets, appliances, overhangs, seams, edges and sign-off before fabrication.
Read the guide →
7 min read
From Approved Quote to Production: The Handoff Fabrication Needs
What information the shop floor needs once a countertop quote is approved, and how to hand off the job without re-entering data or losing revisions.
Read the guide →
7 min read
How to Reduce Countertop Remakes: Common Causes and Fixes
The most common reasons countertop jobs get remade or reworked, and the process controls that prevent them from measurement to installation.
Read the guide →
Put it into practice